Bridge Structure S-109

Year:
2021
Location:
Southgate, ON
Client:

Summary of Work

  • Temporary traffic control, including staged road closures
  • Environmental protection measures and site isolation
  • Removal of the existing expansion joint system
  • Earth excavation for the structure
  • Concrete in structure and parapet walls
  • Type A and B concrete removal and repair
  • Installation of a new expansion joint assembly
  • Bridge deck waterproofing and deck drain replacements
  • Other structural modifications

Project Gallery

Have a project you’d like to discuss?