Head River Bridge on Monck Road

Year:
2024
Location:
Sebright, ON
Client:
City of Kawartha Lakes

Summary of Work

  • Multi-stage traffic control and construction
  • Environmental protection measures and site isolation
  • Partial-depth and full-depth asphalt pavement removals
  • Removal and replacement of the guide rail
  • Earth excavation for structure and approaches
  • Type A, B & C concrete removals and repairs
  • Removal and replacement of Concrete Curb and Gutter
  • Full-depth and partial-depth concrete removals
  • Concrete in substructure, deck, and parapet walls and approach slabs
  • Bridge deck waterproofing and paving

Project Gallery

Have a project you’d like to discuss?