Columbus Road Culvert

Year:
2025
Location:
Whitby, ON
Client:
City of Whitby

Summary of Work

  • Multi-stage traffic control and construction
  • Environmental protection measures and site isolation
  • De-watering, cofferdam, and temporary flow passage
  • Removal and replacement of guide rails
  • Concrete curb, gutter, and outlets
  • Type B & C removal and repairs
  • Excavation behind the existing structure
  • Existing concrete footing removal and replacements
  • Concrete concrete in topping
  • Rip-rap rock protections and erosion controls

Project Gallery

Have a project you’d like to discuss?