Cowan’s Bay Bridge in Omemee

Year:
2024
Location:
Omemee, ON
Client:
City of Kawartha Lakes

Summary of Work

  • Multi-stage traffic control and construction
  • Environmental protection measures and site isolation
  • Partial-depth and full-depth asphalt pavement removals
  • Removal and replacement of the guide rail
  • Earth excavation for the structure and approaches
  • Type B & C concrete removals and repairs
  • Removal and replacement of Concrete Curb and Gutter
  • Full-depth and partial-depth concrete removals
  • Metal traffic barrier installation
  • Concrete wingwall reconstruction
  • Structural concrete crack injections
  • Concrete in substructure, deck, and parapet walls and approach slabs
  • Shoulder granular sealing and reconstruction
  • Fiber optic embedded work and relocations (Cogeco)
  • Bridge deck waterproofing, paving, and asphaltic plug joint