12th Line Minto Bridge

Year:
2021
Location:
Harriston, ON
Client:

Summary of Work

  • Staged traffic control and phased construction
  • Environmental protection measures and site isolation
  • Full-depth removal of concrete and asphalt pavement
  • Type A & C concrete removals and repairs
  • Earth excavation for the structure
  • Bridge deck drain modifications
  • Bridge deck waterproofing installation
  • Roadway re-grading and reconstruction
  • Expansion joint seal replacements