Bridge Structure 2620

Year:
2021
Location:
Kincardine, ON
Client:
The Murray Group Ltd.

Summary of Work

  • Staged traffic control and phased construction
  • Environmental protection measures and site isolation
  • Full-depth removal of concrete and asphalt pavement
  • Type A concrete removals and repairs
  • Earth excavation for the structure
  • Bridge deck drain modifications
  • Bridge deck waterproofing installation
  • Roadway re-grading and reconstruction