Carrick Creek Bridge

Year:
2023
Location:
Mildmay, ON
Client:
Bruce County

Summary of Work

  • Staged pedestrian traffic control and phased construction
  • Environmental protection measures and site isolation
  • Removal of asphalt pavement from concrete surfaces on structures
  • Concrete removal and repair type A
  • Full-depth concrete removals
  • Concrete in parapet walls and approach slabs
  • Concrete wingwall reconstructions
  • Embedded work in structure
  • Bridge deck waterproofing

Project Gallery

Have a project you’d like to discuss?