Rotary Trail Bridge

Year:
2023
Location:
Simcoe, ON
Client:
County of Norfolk

Summary of Work

  • Staged pedestrian traffic control and phased construction
  • Environmental protection measures and site isolation
  • Dewatering, cofferdam installation, and temporary flow diversion
  • Bridge jacking and installation of temporary structural supports
  • Removal and replacement of the existing pier cap
  • Removal and replacement of floor beams
  • Installation of new wood blocking and timber decking
  • Concrete replacement of bridge piles and footings
  • Earthworks, including grading, benching, ditch and stream realignment, and slope construction adjacent to piles